Scheduling
The software solution for planning and scheduling of mining operations

The software system is designed to perform feasibility studies of mining operations in order to increase production profitability.

The software solution for planning and scheduling of mining operations

The solution for scheduling. Software features and your opportunities:

Support of long-term (prospective), current time, and short time operational planning of mining operations

Plan calculation and optimization based on economic criteria with restrictions

Collection of processing volumes by stages and phases, quality assessment by sites

Economic evaluation of main technological processes in the plan considering current prices for consumables

Managing cargo traffic of overburden rock and ore considering equipment units, conditions and throughput of stations, etc.

Calculating ore traffic of the specified quality by ore type, its dressability, and other criteria

Assessment of prepared and blocked-out deposits

Positioning and configuring blocks to be blasted considering equipment units, assessment of quantitative and qualitative indicators of rocks in blocks

Creating plan options (monthly-daily-shift layouts) optimized for various criteria

The software solution to planning of mining operations. Your benefits:

1
Operational and long-term production planning
2
Option to choose the rational direction for mining development
3
Visualization of planning results
4
Generating your calendar for field development by periods
5
Choosing an optimal option for mining management
6
Preparation of a monthly plan for mining operations within your annual plan
7
Automatic layout of monthly plans for mining operations in days and shifts
Application Examples
стр 1 из
Selection of the rational direction for mining development, collection of processing volumes by stages and phases, quality assessment by sites, volume and quality assessment by levels
Site positioning, assessing volumes and quality of ore and overburden rock in selective mining blocks
Site positioning, assessing volumes and quality of ore and overburden rock in drill blocks
Calculating the best option for transporting mined rock considering distance and quality indicators
Calculating the best option for transporting mined rock for each equipment unit
Defining optimal boundaries for pit processing

Request your personal K-MINE presentation

Download presentation
Request a call back or call us:
+ 38 067 569 87 71